Who hears when a brief is approved?

Event command center. Every team with work in it, in every country, the minute it is approved. One board shows where each event stands, and delays surface days early.

Brief approvedClient signs off the brief and budget
Command centerSplits it into tasks from your template for that event typeagent
  • CreativeConcepts, storyboards, designs
  • FabricationJob cards for sets, stages, branding
  • VendorsAV, décor, catering, transport, per country
  • On-groundSite crew in each country
One live boardSlipping tasks raise an alert before they hit the load-in date

Live board

All countries, next 30 days

  • Product launchDubai, 14 Dec

    CreativeSigned off

    FabricationPainting

    Vendors9 of 11 confirmed

    On-groundCrew booked

  • Leadership offsiteMuscat, 18 Dec

    CreativeSigned off

    Fabrication2 days behind

    Vendors6 of 8 confirmed

    On-groundVisas pending

  • Government summitHyderabad, 9 Jan

    CreativeVersion 2 with client

    FabricationWaiting on design

    VendorsQuotes in

    On-groundRecce done

  • Brand pop-upSingapore, 16 Jan

    CreativeConcepts out

    FabricationNot started

    VendorsShortlist

    On-groundVenue held

Early warning, sent on WhatsApp

Leadership offsite, Muscat Stage backdrop is 2 days behind in the workshop. The shipment must leave the workshop by 6 Dec to make the 17 Dec load-in.

Reply 1 to add a shiftReply 2 to call the workshop lead

What we need
Your task list for each event type, and who leads each team in each country.
What changes
No one waits for a call to start work, and no delay is found on site.

Where is the stage right now?

In-house fabrication and production. Job card, materials, the workshop floor, the truck and the load-in slot, in one flow.

  1. Job cardRaised from the approved design, with drawings and sizes
  2. MaterialsIssued from stock; shortfalls go out as purchase requests
  3. WorkshopCut, build, paint and finish, each stage ticked with a photo
  4. DispatchPacking list, vehicle, and shipping papers for UAE, Oman and Singapore
  5. Load-inVenue slot, crew call and unloading order sent to the site lead

Job card JC-0412

Product launch, Dubai

Main stage backdrop, 12 m by 4 m

  1. Cut
  2. Build
  3. Paint
  4. Finish
  5. Pack
Materials
ItemQtyStatus
Plywood, 18 mm42 sheetsIssued
Steel box section160 mIssued
Fabric print, backlit48 m²Ordered, due 3 Dec

Leaves workshop5 Dec

Arrives Dubai10 Dec

Load-in, Hall B13 Dec, 06:00

What we need
A sample job card, your stock list, and how you ship to each country today.
What changes
The office sees the workshop floor without walking it, and nothing reaches a venue late.

Has every vendor confirmed?

Vendor and crew coordination. Each vendor and crew member gets only their part of the run sheet on WhatsApp, confirms with one tap and checks in on the day.

  1. Run sheetFilled in once by the event lead
  2. SplitEach vendor gets only their timings
  3. One tapConfirm, or ask for a change
  4. No reply in 24 hoursFlagged to the event lead
  5. Check-inPhoto and location on arrival

Guru Productions, events

To: Sound and lights vendor

Run sheet: Product launch, Dubai, 14 Dec

Load-in Hall B, 13 Dec, 07:00. Sound check 14 Dec, 15:00. Doors 19:00.

Your list: 2 line arrays, 4 monitors, 1 FOH desk, 24 moving heads.

10 Dec, 11:02

ConfirmNeed a change

Confirm

10 Dec, 11:09

Morning. Send a photo when your truck reaches Hall B.

13 Dec, 06:30

Photo

Checked in at the venue, 06:52

13 Dec, 06:52

Event day, 13 Dec

Product launch, Dubai

Vendor or crewConfirmedChecked in
Sound and lightsYes06:52
LED wallYes07:10
Stage crew, 12Yes11 of 12
FloristYesDue 10:00
Generator backupNo replyCalled at 06:00
CateringYesDue 14:00
What we need
Your vendor list per country and one recent run sheet.
What changes
Fewer calls the night before, and gaps are found while there is still time.

Which version did the client sign?

Client approvals and changes. Storyboards, designs and revisions go to the client as one link. Every comment, version and sign-off is kept with a name and a time.

Stage design, Government summit

Hyderabad, 9 Jan

  1. Version 1

    Sent 2 Dec. 4 comments: logo larger, warmer light, move the podium left.

    Changes asked

  2. Version 2

    Sent 4 Dec. 1 comment: entry arch in the state colours.

    Changes asked

  3. Version 3

    Signed off by the client’s event head, 6 Dec, 16:20. Locked and sent to fabrication.

    Signed

A change after sign-off

“Can the LED wall be two metres wider?”

  1. Logged against version 3, with who asked and when.
  2. The agent checks the job card and the quote, and drafts the impact: one more day in the workshop and a revised quote line.
  3. The client approves the impact before the workshop changes anything.
What we need
How you share designs with clients today, and who can sign off on your side.
What changes
No argument about what was approved, and no unpaid changes slipping into the build.

Did this event make money?

Event closure and billing. The quote, every vendor invoice and the workshop’s own costs land in one sheet, so the final invoice and the client report go out within days.

  1. QuoteWhat the client agreed
  2. Actual costJob cards, crew, travel, vendors
  3. Invoices matchedEach vendor bill against its orderagent
  4. Final invoiceIn the right entity, currency and tax
  5. Client reportPhotos, check-ins and deliverables

Cost against quote

Product launch, Dubai, in AED

LineQuotedActualDifference
Fabrication96,00091,400−4,600
Sound, light, LED74,00074,0000
Crew and travel38,00045,200+7,200
Logistics22,00021,300−700
Total230,000231,900+1,900
  • Sound and lightsInvoice matches the order
  • LED wallInvoice matches the order
  • Crew hotel2 extra nights billed, not on the order. Held for review.
  • TransportInvoice matches the order
What we need
Your quote format and access to your accounting software in each country.
What changes
Every event is closed with a known margin, and overspends show up while the event is still running.

What else could run itself?

Agents that would sit on top of the same system. Optional, and only once the five are running.

  1. Brief reader

    Turns a new brief or tender into a task plan, materials list and first quote.

  2. Venue pack

    Checks the design against the venue’s floor plan, rigging limits and power.

  3. Permits and papers

    Tracks permits and shipping papers per country, and chases what is missing.

  4. Crew travel

    Books flights, hotels and visas for crew, and sends each their plan.

  5. Morning brief

    An 8 am WhatsApp to each country head: due today, late, needs a decision.

  6. Report writer

    Drafts the client report from event-day photos, check-ins and the run sheet.

Where does it run?

One system. Each country sees its own events; Hyderabad sees all of them.

  • India

    Guru Productions, Hyderabad head office

    Currency
    INR
    Clock
    UTC +5:30
  • UAE

    Guru Productions

    Currency
    AED
    Clock
    UTC +4
  • Oman

    Horizon Media

    Currency
    OMR
    Clock
    UTC +4
  • Singapore

    Guru Productions

    Currency
    SGD
    Clock
    UTC +8

Invoices go out under the right entity with that country’s tax. Reminders follow each person’s local time.

Where do we start?

With the command center. Everything else reports into it, so it goes first.

  1. Command centerBriefs become tasks; one live board for every country.
  2. Vendors and crewRun sheets on WhatsApp, confirmations, check-ins.
  3. FabricationJob cards to load-in, with the workshop on the board.
  4. Approvals and closureThe sign-off trail, then cost against quote and the final invoice.

Talk to us

A 30-minute call. Walk us through one event, start to finish, and we show you where it would run itself.

contact@worksmith.tech