More events. Less chaos.
Five automations that carry every brief across India, UAE, Oman and Singapore.
Who hears when a brief is approved?
Event command center. Every team with work in it, in every country, the minute it is approved. One board shows where each event stands, and delays surface days early.
- CreativeConcepts, storyboards, designs
- FabricationJob cards for sets, stages, branding
- VendorsAV, décor, catering, transport, per country
- On-groundSite crew in each country
Live board
-
Product launchDubai, 14 Dec
CreativeSigned off
FabricationPainting
Vendors9 of 11 confirmed
On-groundCrew booked
-
Leadership offsiteMuscat, 18 Dec
CreativeSigned off
Fabrication2 days behind
Vendors6 of 8 confirmed
On-groundVisas pending
-
Government summitHyderabad, 9 Jan
CreativeVersion 2 with client
FabricationWaiting on design
VendorsQuotes in
On-groundRecce done
-
Brand pop-upSingapore, 16 Jan
CreativeConcepts out
FabricationNot started
VendorsShortlist
On-groundVenue held
Early warning, sent on WhatsApp
Leadership offsite, Muscat Stage backdrop is 2 days behind in the workshop. The shipment must leave the workshop by 6 Dec to make the 17 Dec load-in.
Reply 1 to add a shiftReply 2 to call the workshop lead
- What we need
- Your task list for each event type, and who leads each team in each country.
- What changes
- No one waits for a call to start work, and no delay is found on site.
Where is the stage right now?
In-house fabrication and production. Job card, materials, the workshop floor, the truck and the load-in slot, in one flow.
- Job cardRaised from the approved design, with drawings and sizes
- MaterialsIssued from stock; shortfalls go out as purchase requests
- WorkshopCut, build, paint and finish, each stage ticked with a photo
- DispatchPacking list, vehicle, and shipping papers for UAE, Oman and Singapore
- Load-inVenue slot, crew call and unloading order sent to the site lead
Job card JC-0412
Product launch, Dubai
Main stage backdrop, 12 m by 4 m
- Cut
- Build
- Paint
- Finish
- Pack
| Item | Qty | Status |
|---|---|---|
| Plywood, 18 mm | 42 sheets | Issued |
| Steel box section | 160 m | Issued |
| Fabric print, backlit | 48 m² | Ordered, due 3 Dec |
Leaves workshop5 Dec
Arrives Dubai10 Dec
Load-in, Hall B13 Dec, 06:00
- What we need
- A sample job card, your stock list, and how you ship to each country today.
- What changes
- The office sees the workshop floor without walking it, and nothing reaches a venue late.
Has every vendor confirmed?
Vendor and crew coordination. Each vendor and crew member gets only their part of the run sheet on WhatsApp, confirms with one tap and checks in on the day.
- Run sheetFilled in once by the event lead
- SplitEach vendor gets only their timings
- One tapConfirm, or ask for a change
- No reply in 24 hoursFlagged to the event lead
- Check-inPhoto and location on arrival
Guru Productions, events
To: Sound and lights vendor
Run sheet: Product launch, Dubai, 14 Dec
Load-in Hall B, 13 Dec, 07:00. Sound check 14 Dec, 15:00. Doors 19:00.
Your list: 2 line arrays, 4 monitors, 1 FOH desk, 24 moving heads.
10 Dec, 11:02
Confirm
10 Dec, 11:09
Morning. Send a photo when your truck reaches Hall B.
13 Dec, 06:30
Photo
Checked in at the venue, 06:52
13 Dec, 06:52
Event day, 13 Dec
| Vendor or crew | Confirmed | Checked in |
|---|---|---|
| Sound and lights | Yes | 06:52 |
| LED wall | Yes | 07:10 |
| Stage crew, 12 | Yes | 11 of 12 |
| Florist | Yes | Due 10:00 |
| Generator backup | No reply | Called at 06:00 |
| Catering | Yes | Due 14:00 |
- What we need
- Your vendor list per country and one recent run sheet.
- What changes
- Fewer calls the night before, and gaps are found while there is still time.
Which version did the client sign?
Client approvals and changes. Storyboards, designs and revisions go to the client as one link. Every comment, version and sign-off is kept with a name and a time.
Stage design, Government summit
Version 1
Sent 2 Dec. 4 comments: logo larger, warmer light, move the podium left.
Changes asked
Version 2
Sent 4 Dec. 1 comment: entry arch in the state colours.
Changes asked
Version 3
Signed off by the client’s event head, 6 Dec, 16:20. Locked and sent to fabrication.
Signed
A change after sign-off
“Can the LED wall be two metres wider?”
- Logged against version 3, with who asked and when.
- The agent checks the job card and the quote, and drafts the impact: one more day in the workshop and a revised quote line.
- The client approves the impact before the workshop changes anything.
- What we need
- How you share designs with clients today, and who can sign off on your side.
- What changes
- No argument about what was approved, and no unpaid changes slipping into the build.
Did this event make money?
Event closure and billing. The quote, every vendor invoice and the workshop’s own costs land in one sheet, so the final invoice and the client report go out within days.
- QuoteWhat the client agreed
- Actual costJob cards, crew, travel, vendors
- Invoices matchedEach vendor bill against its orderagent
- Final invoiceIn the right entity, currency and tax
- Client reportPhotos, check-ins and deliverables
Cost against quote
| Line | Quoted | Actual | Difference |
|---|---|---|---|
| Fabrication | 96,000 | 91,400 | −4,600 |
| Sound, light, LED | 74,000 | 74,000 | 0 |
| Crew and travel | 38,000 | 45,200 | +7,200 |
| Logistics | 22,000 | 21,300 | −700 |
| Total | 230,000 | 231,900 | +1,900 |
- Sound and lightsInvoice matches the order
- LED wallInvoice matches the order
- Crew hotel2 extra nights billed, not on the order. Held for review.
- TransportInvoice matches the order
- What we need
- Your quote format and access to your accounting software in each country.
- What changes
- Every event is closed with a known margin, and overspends show up while the event is still running.
What else could run itself?
Agents that would sit on top of the same system. Optional, and only once the five are running.
Brief reader
Turns a new brief or tender into a task plan, materials list and first quote.
Venue pack
Checks the design against the venue’s floor plan, rigging limits and power.
Permits and papers
Tracks permits and shipping papers per country, and chases what is missing.
Crew travel
Books flights, hotels and visas for crew, and sends each their plan.
Morning brief
An 8 am WhatsApp to each country head: due today, late, needs a decision.
Report writer
Drafts the client report from event-day photos, check-ins and the run sheet.
Where does it run?
One system. Each country sees its own events; Hyderabad sees all of them.
India
Guru Productions, Hyderabad head office
- Currency
- INR
- Clock
- UTC +5:30
UAE
Guru Productions
- Currency
- AED
- Clock
- UTC +4
Oman
Horizon Media
- Currency
- OMR
- Clock
- UTC +4
Singapore
Guru Productions
- Currency
- SGD
- Clock
- UTC +8
Invoices go out under the right entity with that country’s tax. Reminders follow each person’s local time.
Where do we start?
With the command center. Everything else reports into it, so it goes first.
- Command centerBriefs become tasks; one live board for every country.
- Vendors and crewRun sheets on WhatsApp, confirmations, check-ins.
- FabricationJob cards to load-in, with the workshop on the board.
- Approvals and closureThe sign-off trail, then cost against quote and the final invoice.
Talk to us
A 30-minute call. Walk us through one event, start to finish, and we show you where it would run itself.
contact@worksmith.tech